Data Center Construction Quality Assurance & Quality Control (QA/QC)

Oracle

Confirmed live yesterday High trust

Quick summary

Work type
On-site
Location
El Paso, TXLas Cruces, NM
Salary
$102,300–$209,500 / yr
Posted
125 days ago
Freshness
Confirmed live yesterday

Market check

Salary context

Competitive pay

How this pay compares to similar roles

Similar $177k
This role $156k
$88k most similar roles pay here $236k

This role pays less than 63% of similar roles. Most pay $139,200–$214,000 — the shaded band above. At the midpoint, this role pays about $156k versus about $177k for comparable roles.

Based on 240 similar postings.

Employer

About Oracle

Oracle Corporation is a leading multinational technology company specializing in database software, cloud computing, and enterprise software.

Oracle currently has 781 open roles on FindRole.

Listed pay typically runs $102,300–$209,500 across 713 roles with salary data.

Most-posted roles

View all roles at Oracle

At a glance

TL;DR · Data Center Construction Quality Assurance & Quality Control (QA/QC)

As a Senior Data Center Facilities Development Manager I – QA/QC within the Oracle Cloud Infrastructure team, you will lead quality assurance and control for large-scale data center construction projects. You will manage field-level and program-level oversight to ensure that all construction work, materials, systems, and documentation meet rigorous technical standards and operational requirements. Your daily responsibilities include conducting field inspections of mechanical, electrical, plumbing, and structural systems; managing non-conformance reports; and driving contractor accountability for quality performance. You will utilize expertise in inspection test plans, method statements, and commissioning readiness to ensure seamless transitions from construction to operations. The role requires proficiency in reviewing technical drawings, performing root cause analysis, and coordinating with cross-functional teams. This position addresses the critical challenge of delivering high-quality mission-critical infrastructure for global cloud and AI systems.

What you'll do

  • Lead QA/QC oversight for data center construction to ensure compliance with technical specifications, codes, and OCI standards.
  • Conduct field inspections of mechanical, electrical, structural, and other critical systems to verify installation quality.
  • Manage non-conformance reports by performing root cause analysis and driving corrective actions for recurring issues.
  • Hold general contractors and vendors accountable for performance metrics, material requirements, and project documentation.
  • Verify that all construction work is documented and ready for commissioning and operational turnover.
  • Review design packages and drawings to identify potential quality risks or constructability concerns early in the process.
  • Provide regular QA/QC status reports and data-driven updates to project leadership and stakeholders.

What we're looking for

  • Must have 6 to 10+ years of experience in construction QA/QC, facilities development, or mission-critical infrastructure projects.
  • Bachelor’s degree in Construction Management, Engineering, Architecture, Facilities Management, or a related field (or equivalent practical experience).
  • Proficiency in reviewing technical documents including drawings, specifications, submittals, and inspection test plans.
  • Working knowledge of mechanical, electrical, plumbing, fire protection, and structural systems in complex facilities.
  • Experience managing contractor and vendor quality performance on active construction sites.
  • Ability to identify quality risks, installation defects, and documentation gaps before commissioning or operations.
  • Strong communication skills for interacting with field teams, engineers, contractors, and senior stakeholders.
  • Professional certifications such as CQM, CQE, PMP, LEED, OSHA, RCDD, BICSI, ASQ, or related credentials (preferred).

More like this

Similar roles

Data Center Construction Manager

Oracle

79 days ago $102,300$209,500
Data Center Construction Project Management Commissioning Quality Control Networking Structured Cabling Vendor Management Site Walks Design Review Resource Allocation
3+ yrs exp

Senior Data Center Construction Manager

Oracle

79 days ago $126,200$264,100
Data Center Construction Networking Structured Cabling Commissioning Quality Control Project Management Vendor Management Site Walks Design Review
6+ yrs exp

Director, Data Center Construction

Oracle

102 days ago $146,300$306,400
Data Center Construction Project Management Commissioning Quality Control Networking Structured Cabling Vendor Management Site Walks Project Planning Design Review
6+ yrs exp

Director, Data Center Construction

Oracle

79 days ago $146,300$306,400
Data Center Construction Project Management Commissioning Quality Control Networking Structured Cabling Vendor Management Site Walks Design Review
6+ yrs exp