Lead Principal Physical Security Engineer, Hyperscale Data Center Construction
Oracle
Quick summary
Market check
How this pay compares to similar roles
This role pays more than 71% of similar roles. Most pay $175,850–$226,350 — the blue band above. At the midpoint, this role pays about $221k versus about $201k for comparable roles.
Based on 240 similar postings.
Employer
Oracle Corporation is a leading multinational technology company specializing in database software, cloud computing, and enterprise software.
Oracle currently has 955 open roles on FindRole.
Listed pay typically runs $102,300–$234,600 across 790 roles with salary data.
Most-posted roles
At a glance
The Lead Principal Physical Security Engineer joins the Physical Security Systems team to serve as a senior technical authority for physical security systems during complex hyperscale data center construction projects. This role involves overseeing security integrators and contractors through installation, configuration, testing, and turnover while ensuring systems meet specific standards. Key responsibilities include reviewing construction drawings, specifications, and commissioning documentation, as well as managing vendor scope and schedule impacts. The engineer will integrate access control, video surveillance, intrusion detection, intercoms, and perimeter security with site networks and monitoring platforms. Required expertise includes low-voltage construction, structured cabling, and experience with platforms like LenelS2, Genetec, Avigilon, CCure, or Axis. The role solves technical and quality risks to ensure mission-critical security systems are fully functional before operational handover.
Skills
What you'll do
What we're looking for
More like this
Oracle
Oracle
Oracle
Oracle
Oracle
Oracle